Good article, however I believe some of the priority are wrong. first, the first step should be the continuous and adequate supply of gas to all commissioned and existing gas plants. There should be enough gas supplied to them to ensure that they can generate electricity for 3 months straight. second, a rapid and aggressive metering should be started and supported by the federal govt. All DISCO should have a time period to meter certain number of customers. This can be done with local capacity and local produced meters. Third, aggressive and rapid expansion of the transmission lines across the nation. renewable electricity should be pursued for the rural area and all available source of energy should be used.